Hi All,
This was completed a few weeks ago and in the end it was a fairly simple mod.
I got hold of some thread gauges and some taps and l measured the Kick pivot thread as 5-40 unc.
Interestingly it turns out that the PST ll pivot's are 6-32 unc.
After a few calls to a few mates with decent workshops, I found a suitable tap and drilled and tapped it out on a lathe whilst I was there.
It also needed a small amount of metal to be removed from the handle near the locking tab for the little tag on the side of the clip. I did this with small jewelers files etc.
I then ordered some suitable stainless steel button head screws and used a small SS washer as well.
Its currently in regular rotation with my modded Kick for EDC. The only thing that's lacking with the PST ii is a wood saw - but there are plans underway to sort this...
The last pic shows all the LM's I have with pocket clips.
Cheers
George