Day 24Good cap lifter, bad soda.
Day 23Sharpened the corner of the chisel a little and tested on opening an Amazon package
Day 23:I'm really excited about sharing this. One of the reasons that I was psyched about this Modular February Challenge is that I knew that it would force me to finish more of my ProLock mods. Unfortunately I didn't get to all of them, but I did some. I wanted a tool insert that would have one of those bit drivers that house a double ended hex collar that fits 2 double ended bits. (one on either end) just like the Shrade ST5E and the Blackfire MT. I was able to get all the doner parts that I needed from a Milwaukee screw driver that they sell at Home Depot. Then I welded the marlin spike from a British Army knife to the end of one of the hex collars. This way it is much more sturdy in use than it would be if I had just made it into a bit. If I carry the 2 collars in the sheath with the tool, I can have the marlin spike and 6 bits. I haven't had time to polish it yet, still looks dirty.
You’ve got to have a huge pair of cajones to drink something called Grandpa Joe’s Hot Dog Water. Respect for taking one for the team!
Day 24Companion opened a padded mailer with a new bead, the cut some paracord to add it to a zipper pull on my backpack.
Day 25
Day 25, small scissors back in action
Day 25I had to get a regular screwdriver b/c some of the screws were really tight. The Flex was still really useful though!